亚洲国产91精品久久久久,日本不卡一二三区免费高清,亚洲成a人在线免费观看,欧美日韩在线观看视频在线,成人av免费不卡在线观看,曰本久久精品一区二区三区,少妇人妻av一区二区在线8,我想看中国国产黄色一级片

Power Projects
Power Projects Harbor And Shipbuilding Projects Projects In Other Sectors
Shweli River Hydropower Station (Myanmar)
Release date:2022-05-26 source:原創(chuàng) browse:5532
Browse and share:
  • UREC energetically participates in development of hydropower resources at home and abroad and dedicates to foster concentrically diversified business mode that takes investment, construction and operation management in hydropower projects as backbone work and has invested in some hydropower projects as share-controller or share-participant.

  • Since Myanmar is a country seriously short of electricity, UREC has built up around 20 power stations for Myanmar since 1989 yet still cannot satisfy the country’s requirement of electricity. Therefore, resorting on the eximious natural conditions of Shweli River, Shweli River Hydropower Station was placed in the development schedule of Ministry of Electric Power. From 1996 to 2001, UREC had investigated and explored at the site of Shweli River and formed a large amount of materials for Myanmar Government’s reference. In February 2002, Chairman of Myanmar instructed that Shweli River Hydropower Station should be constructed by UREC as soon as possible.

  • On the above support and working basis, UREC has decided that its main development tasks must include three cascade hydropower projects on Shweli River Basin in the Union of Myanmar with total installed capacity of 2000MW. The construction of Shweli (1) hydropower project (600MW) was completed in 2009 and its first turbine-generator unit became to generate electricity in 2008.

  • The installed capacity of Shweli (1) hydropower project is 600MW (6×100MW) with the annual average generating capacity of 403.3 million Kilowatthour. The annual available generating time is 6722 hours and the generating electricity can reach 174 thousand KW. The station has been jointly executed by UREC and Yunnan Union Electricity Developing Company on the basis of BOT with the licensed operation period of 40 years. At present,Shweli (1) hydropower project has completed and put into use successfully.


copyright? 2022 All Rights  UREC  滇ICP備12005153號-1
    technical support:奧遠科技
军事| 盖州市| 庆安县| 波密县| 金湖县| 九江市| 枣阳市| 堆龙德庆县| 庐江县| 汾阳市| 富民县| 桃源县| 武鸣县| 凌海市| 菏泽市| 仪陇县| 信丰县| 德安县| 贡山| 松桃| 葫芦岛市| 商水县| 大城县| 保靖县| 灵台县| 渑池县| 东兰县| 大港区| 油尖旺区| 吉林市| 荆州市| 措勤县| 房山区| 嘉善县| 石屏县| 咸丰县| 玛纳斯县| 岗巴县| 班戈县| 多伦县| 绥中县|